Monday, December 15, 2008

My 2nd holidays project


Take one (this one I got control the light amount [manually])
haha >.<

Before I didn't do anything about it
It reflects light

Why do I say this is my second holidays project. My first one is finished reading New Moon. This is the second. Actually both of them did not appear to be in my to do list. I always change my mind so it is quite a waste for making a to do list or plan earlier to do anything after exam. I have not enough enthusiasm. But once i fall in love in something no one can stop me. Like the image above the JIGSAW PUZZLE it took me 2 days. I am not 24 hours working on it so it took longer time to finish.

I think of framing it. What do you think?? Yesterday 12.00 a.m in the midnight i finish the very last piece kind of proud. I have three missing pieces that makes me worry when my friend told me whether if my mum swept it away ! I opened this box before but I gradually give up to manage the 1000 pieces. I kind of person that throwing everything in places that can be seen or not when i get fade up with something. This make my room look messy. I found out that when i do this puzzle> My messy room doesn't really a matter for me hahaha..

Yesterday too happy till could not fall asleep so wake up earlier to make my jigsaw puzzle stronger by using cellophane tape to stick all the 1000 pieces together. Agh about the framing thing. I wander will it be a waste of money cause the image is big (75x50)cm. Erm about 4 B4 drawing block and 5 the original box. haha kinda big? Don't you thing so.

The very things is to clean up my messy room. I feel truely exhausted. When looking into the messy room hahaa.

0 Comments:

Post a Comment

Subscribe to Post Comments [Atom]

<< Home